HI Experts,
My WM storage is separated as compacters and each compacter has bins. Compacters are defined as storage sections of same storage type.
when I do GR and TO, entire batch should go to one or more bins in one compacter. I.e batch can't be split between compacters. Batch can split between bins in same compacters.
How can I achieve this. Currently batch going to second compacter if first compacter has not enough space.
Ex:
Compacter1 Compacter2
C1Bin1 C2Bin1
C1Bin2 C2Bin2
C1Bin3 C2Bin3
Assume each bin has capacity of 100PC (i.e Can hold 4 lots (4*25))
When I do GR and TO,
1. GR1 with 200 should go to C1Bin1 and C1Bin2 in Compacter1
2.GR2 with 200 should go to C2Bin1 and C2Bin2 in Compacter 2
Problem is system places C1Bin3 100PC and C2Bin1 100PC
Please advise.
Thanks
Rayudu
Message was edited by: Jürgen L