Hi
I have a requirement where only 1 SUT should be allowed to be binned. Its possible for the material to arrive in a SUT P1 and P2. In the MM I have P1 as my first pallatization and P2 as the 2nd. Putaway strategy is manual.
Extract from SAP Help:
You can stipulate that the storage bin can contain only one standard storage unit type. This is taken from the first SUT field under Palletization data in the material master record.
So my understanding is that in this case I would only be allowed to bin a P1 in the bins within the storage type and never a P2?
Also, I did the config and I first binned a P1 and then after this the system also let me bin a P2?
What im actually want is that both P1 and P2 should be able to be binned but if either SUT first is binned then only the same SUT can be binned until the bin is empty.
What am I missing?
Thanks
Clayton