Hi,
We have the below scenario,
We do goods receipt from MIGO in WM enabled storage location, after that we do part no to part no conversion from 309 mvt at IM level, after this the PCN TO creation and confirmation is done immediately along with IM posting through standard configuration. We have a background job running every hour which converts these received part no to the internal part no through 309 IM posting. the job also takes care of PCN auto TO creation and confirmation.
This is working fine if there are one GR per material. some times there are multiple GR being posted of the same material in different lots. Under such cases the auto PCN TO creation fails. I searching the forum I came to know that is is the standard behavior.
My requirement is to create Auto PCN TO and confirm immediate even for multiple lots.
Pl suggest,
Regards,
Pranab